Twelve Questions That Separate Engineering from Brochure

A detection system is bought twice: once from the datasheet, and once from the answers the vendor gives when you ask in writing. This list is the second purchase.

ProcurementVendor evaluation
Detection system engineering and testing
Every question below has a measurable answer. A vendor who cannot produce one is telling you what their system is made of.

How to use this list

Send the questions in writing before the first commercial meeting, and ask for written answers with evidence attached: test reports, recorded data, interface documents. Verbal answers in a demo room are worth nothing — the same questions will reappear at acceptance testing, and only what exists in writing survives that journey. Score each answer on a simple scale: measured evidence, plausible engineering argument, or adjective.

None of the questions are hostile; all of them are standard practice in radar and communications procurement. A serious vendor will welcome them, because they have done this work. The vendor who deflects three of the twelve is not having a bad day — they are showing you the product.

The twelve questions

  1. 01

    1. Range against what target, at what probability?

    Ask for detection range against a stated radar cross-section — 0.01 m² for a small multirotor — at a stated probability of detection and false-alarm rate. A good answer is a number with a test report. 'Up to 10 km' with nothing attached is a slogan.

  2. 02

    2. What is the false-alarm budget after tuning?

    Every sensor trades detection against false alarms; anyone claiming zero is claiming magic. Ask for alarms per day per site after a defined tuning period, measured over at least 30 days — and ask who decides when tuning is finished.

  3. 03

    3. How does it tell a drone from a bird?

    Expect a concrete mechanism — micro-Doppler signatures, track behaviour, EO confirmation — plus measured per-class accuracy in environments like yours. 'AI-powered' without numbers is a black box you are asked to pay for.

  4. 04

    4. Show us rain, fog, night and clutter

    Ask for recorded raw data from bad weather and cluttered terrain, not a sunny-day demonstration. Performance in your worst month is what you are buying; performance on demo day is what they are selling.

  5. 05

    5. What is the track capacity, and what breaks first?

    How many concurrent tracks, what happens with crossing targets, and which subsystem saturates first under load — sensor, tracker or console. The answer predicts how the system behaves exactly on the day you need it most.

  6. 06

    6. What is the update policy?

    Clutter maps, classifier libraries, signal databases and firmware all age as drone fleets evolve. Ask how often updates ship, what they contain, and how many years of updates are contractually committed. Less than five years is a warning.

  7. 07

    7. Show us the interface document

    A documented track output — standard format or JSON — with stated latency, plus who owns the recorded data. If integration is 'available' but undocumented, you are buying a closed box and a future invoice.

  8. 08

    8. How does it fail?

    Every system fails; the question is how. Ask for reliability figures, single points of failure, and what the degraded mode looks like — does one dead node blind a sector silently, or does the console tell you?

  9. 09

    9. What does installation actually require?

    Masts, power, network, lightning protection, calibration, access for maintenance — and specifically what is not in the quote. The difference between box price and working capability routinely runs tens of percent.

  10. 10

    10. What does year five cost?

    Spares, subscriptions, recalibration, training refreshers, support tiers. Ask for a ten-year ownership figure in writing; our cost-breakdown article shows the categories. A cheap system with an expensive decade is not cheap.

  11. 11

    11. Will you run a witnessed trial on our site?

    Your terrain, your test profiles, your observers, recorded raw data — and acceptance criteria in the contract based on its results. A vendor who refuses a witnessed trial has answered the other eleven questions for you.

  12. 12

    12. Who else runs it, and may we call them?

    Ask for comparable deployments you can contact — sector, scale, climate — and ideally a site visit. References that cannot be named can still be described and called through the vendor. Silence here is also an answer.

Red-flag answers worth walking away from

Range without physicsA kilometre figure with no target size, probability or false-alarm rate attached
Zero false alarmsDetection theory does not allow it; the claim marks marketing, not engineering
Adjective classification'AI-powered', 'smart filtering' — with no measured per-class accuracy
Demo-only evidenceNo recorded raw data, no third-party test, no bad-weather records
Undocumented integrationAn interface that exists only as a promise in a slide deck
Short commitmentsUpdate and support commitments shorter than the tuning and ramp-up period

One red flag is a question to press; three is a procurement decision.

Turning answers into a decision

Run two or three vendors through the same list, score the answers, and normalize what you get onto one page — the same technique as in our radar-price article. Then let the witnessed trial arbitrate what the paperwork cannot. The order matters: questions first, normalization second, trial third, contract last. Skipping the written stage is how projects end up acceptance-testing a promise.

The meta-lesson of the twelve questions is simple: you are not buying a sensor, you are buying measured behaviour in your environment. Anything the vendor cannot measure, you cannot accept-test; anything you cannot accept-test, you did not actually buy.

Questions buyers ask us

When in the process should we ask these?

Before the tender goes out, as a written annex to your requirement. Vendors answer more carefully in writing, and their answers become part of the contract baseline. Asking the same questions after signing turns them from selection criteria into disputes.

Do the questions change for RF, radar or EO?

The spine is identical — measured performance, false alarms, classification, updates, interfaces, failures, true cost, trial, references. Each family adds its own: spectrum survey support for RF, clutter behaviour for radar, cueing latency and slew rate for EO. The family articles on this site cover those specifics.

What if a vendor refuses the witnessed trial?

Then you have learned the most valuable fact in the evaluation at zero cost. Serious vendors insist on witnessed trials, because passing one ends the argument. A refusal means the brochure performance does not survive contact with your terrain.

How many vendors should we run through this?

Two or three. Fewer and you have no normalization baseline; more and the evaluation itself becomes a project. If three written answer sets all dodge the same question, that question is telling you something about the market segment, not the vendors.